Pro-Form 350 Specifiche Pagina 14

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 13
2-4 EM-506 (N-07/03)
This condition is corrected by adding or removing shims
under one of the rear housing feet. In Example #2 the
excessive clearance was at the right guide and slide.
Since this measurement was positive, the clearance was
at the top. To bring the alignment into tolerance, shims
could be added under the right rear housing foot, or
removed from the left rear housing foot. The alignment
must be corrected even if it causes the bed to be out-of-
level.
After the machine is level, retighten foundation bolt nuts
securely. Recheck guide and slide alignment.
IMPORTANT: Before running the machine, tighten
the guide clamp bolts to 60 ft.-lbs. (81.4Nm) and
lubricate slide liners with light hydraulic oil. Use
tool shown in Figure 2-4 supplied by
CINCINNATI INCORPORATED.
FIGURE 2-4 Tool for guide clamp bolts
IMPORTANT: After loosening and tightening guide
clamp bolts for ram guide and slide alignments, the
linear transducers should be checked and possibly
reset per “Ram Linear Transducer Adjustment”
instructions in SECTION 9.
Alignment may not be permanent. Recheck level in a
few weeks. Do not use any grouting around the machine.
For machines where the bed goes below floor level,
leave the bed pit empty and cover exposed pit opening
with steel plate.
HYDRAULIC RESERVOIR
The hydraulic reservoir is equipped with a drain valve.
See Figure 1-2. Before starting machine, crack this valve
open. Water may have collected in the tank during
shipment. If no water comes out, or when oil starts
coming out, close the valve securely. Repeat this check
monthly.
LUBRICATION
Proper lubrication is of extreme importance to your
machine. The following lubrication points should be
checked before start-up and at regular intervals
thereafter.
1. Hydraulic Reservoir: Before starting machine check
for proper fluid level at the oil sight gage. The ram
must be at full open height to properly check fluid
level. See Figure 1-2. Refer to
SECTION 9 for
details about proper fluid level.
2. Cylinder Clevis Pins: Lubricate while cycling ram
under load, such as obtained with a bumping die.
Lubricate once a month. Use a #2 lithium base
grease with “moly” additive (C.I. grease H-2M).
This must be done after electrical connections are
made and the machine is running.
3. Ram Guides and Slide Liners: Wipe clean and flush
with light hydraulic oil.
4. Gages: Clean and lubricate all exposed guide rails
with a light coating of spray lubricant or #10 oil. The
X and R-Axis ballscrews should also be lubricated
with a light coating of spray lubricant or #10 oil.
These ballscrews are easily accessed by removing
the protective covers. Do not use grease on the
ballscrews. See
SECTION 9, MAINTENANCE &
ADJUSTMENTS for more specific details.
ELECTRICAL CONNECTION
Suitable electrical leads must be brought to the machine
as shown on Foundation Plan drawing. These leads are
connected to the incoming side of electrical disconnect
switch in the main electrical enclosure. Be certain that
leads are the correct size and that proper voltage is fed to
the machine. CINCINNATI INCORPORATED
equipment requires that the incoming line supply at the
machine does not vary more than plus or minus 10%
from the nominal. Some installations may require
additional line conditioning other than supplied with the
machine controls. Contact CINCINNATI
INCORPORATED Service Department for further
information.
Machine must be connected to a good earth ground. A
ground lug on the electrical panel near the disconnect is
Vedere la pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 73 74

Commenti su questo manuale

Nessun commento